FESCO provides project transportation of oversized and heavy cargo from receiving it at the manufacturing facility to installing the transported structures at the destination point.
Construction of a mining and processing plant on the Kamchatka Peninsula
Customer
JSC Bystrinskaya Mining Company
Period
March-June 2022
Job
Cargo consolidation at the temporary storage warehouse in the Vladivostok area
Road haulage of cargo to the port of Vladivostok by standard and lowbed trucks
Cargo handling in the port of Vladivostok and loading onto the vessel Fesco Paris
Sea transportation by Fesco Paris to seashore of the Kamchatka Peninsula
Transhipment of cargo from a vessel onto boats and barges at anchorage
Unloading on an unequipped shore deploying Ponton barge
Cargo total weight of cargo – 3 911 tons
Transportation of equipment for Amur Gas Chemical Complex
Customer
AGCC
Period
April-September 2022
Job
Delivery of technological equipment from 20 different geographical locations in Europe and Southeast Asia to Svobodny for the Fareast Gas Chemical Complex in a restricted time frame under sanctions pressure. For the first time FESCO organized such a large-scale work on transshipment of OOG cargo at anchorage from an ocean-going vessel to barges for further delivery to the construction site.
Cargo: 182 units of OOG, total weight 15 526 tons, volume 55 844 m3, including cargo units up to 400 tons
Integrated Logistics Solutions for Sakhalin Energy Investment
Customer
Sakhalin Energy Investment
Period
2021 - 2022
Job
Container transportation from Italy to Korsakov by FESCO service: complex export customs clearance in the country of departure, sea transportation from Europe to St. Petersburg, then FESCO railway service from St. Petersburg to Vladivostok, sea transportation from Vladivostok to Korsakov.
Transportation of a gas turbine engine manufactured by ROLS-ROYCE POWER ENGINERING from Korsakov, Sakhalin to the UK (Dyce, Aberdeen). Sea transportation by FESCO service from the port of Korsakov to the port of Busan, loading in Busan on the CMA CGM 20'FR, delivery of cargo on 20'FR by CMA CGM service from the port of Busan to the port of Grandjemouth, Great Britain, road transportation to the warehouse of the consignee in Dyce, Aberdeen.
Similar transportation of a gas turbine engine from Korsakov, Sakhalin to Italy.
Delivery of equipment on a charter flight from Heathrow Airport, London, UK to Yuzhno-Sakhalinsk Airport with preliminary collection from the consignor's warehouse.
Description of cargo equipment with a total weight of 22 474 kg
Delivery of two drilling rigs to the Krasnodar Krai
Customer
LLC RN-BURENIE
Period
October 2021 – February 2022
Job
Sea transportation of drilling equipment from the port of Manaus, Brazil, on the vessel "Symphony Spirit" to the port of Novorossiysk.
Loading, survey and additional packaging of two disassembled drilling rigs in Manaus, loading and unloading operations and customs clearance in Novorossiysk.
Road transportation of cargo to the client's production site in the Krasnodar Territory.
Delivery of equipment for the Baimsky Mining and Processing Plant on Peschanka, Chukotka.
Customer
Dalian Baoxin | NFC , Kaz Mineral
Period
2021-2022
Job
Transportation of cargo on its own vessel FESCO PARIS from Xingang, China and on the vessel Sergey Gavrilov from Vladivostok to Pevek. Customs clearance in the port of VMPP (Pervomaisky).
Transportation of large consignments of cargo from Arkhangelsk to Pevek. Cargo consolidation, delivery to the port for loading, sea transportation by vessels Grigory Shelikhov, Georgy Sedov and Polar King and unloading in the port of Pevek, as well as ice escort.
Mobilization of the Mi26 helicopter for air transportation on the route Pevek - Keperveem - Peschanka - Keperveem - Pevek. Air transportation with preliminary collection of cargo by truck from Moscow and Yekaterinburg: several flights from the airport in Khabarovsk to Keperveem airport, Chukotka region.
Multimodal transportation of oversized cargo from Germany to the port of Arkhangelsk with further shipment by sea to the port of Pevek. Complete customs clearance of cargo.
Delivery of equipment to China
Customer
JSC "OKBM Afrikantov"
Period
November – December 2021, May – June 2022.
Job
Delivery of two similar cargoes - “Main circulation pump of the first circuit. Pull-out part" (115 tons) – by road and rail transport on the route: Russia, Nizhny Novgorod, JSC "OKBM Afrikantov" - railway station "Kostarikha" - railway station "Manchuria".
Development and approval in the administration of JSC "Russian Railways" of the placement and lashing schemes of the 8-axle transporter; organization of the allocation by JSC "Russian Railways" of the railway transporter.
Organization of lease of railway dead end siding and preparation for the acceptance of cargo.
Mobilization of a road train with modular trailers of 13 axles.
Mobilization/demobilization of a rigging crew and a portal system with load lifting capacity of 1000 tons to the Kostarikha station.
Road transportation and transhipment of cargo from the 13 axles road train to the railway transporter, cargo lashing on the railway transporter.
Delivery of equipment for a synthetic liquid fuels production plant (Uzbekistan GTL)
Customer
ENTER Engineering
Period
January - May 2021
Job
Transportation of oversized cargo from the city of Piacenza (Italy) by specialized vehicles (modular semi-trailers, low-bed semi-trailers) to a synthetic liquid fuel production plant in Uzbekistan.
Transshipment of Chinese cargo in the port of Vladivostok, further delivery by rail to the Mys-Churkin station in Uzbekistan.
Delivery of equipment for Yerevan CHPP
Customer
SVEL
Period
July 2021
Job
Delivery of a transporter with a transformer for the Yerevan CHPP to the Kavkaz station, further sea transportation to the Georgian port of Poti on an irregular railway ferry.
Organization of railway transportation from the port of Poti to Hrazdan station (Armenia).
Transshipment of the transformer from the railway transporter to road trains with modular trailers for transportation to the village of Lichk.
Arrangement of all official special permits for road transportation of cargo and infrastructure works, including strengthening of bridge structures on the route, lifting (installation / dismantling) of metal structures and gas pipes. Escort of cargo with shelter vehicles
Unloading of the transformer from the road train at the Lichk substation with installation into the cell by rigging.
Delivery of equipment for the plant VSMPO-AVISMA
Customer
VSMPO-AVISMA Corporation
Period
August - December 2021
Job
Multimodal transportation (road + sea + road) of oversized cargo in customs transit from Villabona, Spain to the plant of VSMPO-AVISMA Corporation in the city of Verkhnyaya Salda, Sverdlovsk region.
Transportation by road using modular and low-bed semi-trailers of OOG cargo from the city of Świebodzin (Poland) to the plant of VSMPO-AVISMA Corporation in the city of Verkhnyaya Salda.
Delivery of machine tools from Spain and Poland for the modernization of the plant in Verkhnyaya Salda
Customer
VSMPO-AVISMA Corporation
Period
August - December 2021
Job
FESCO carried out multimodal transportation (road + sea + road) of oversized cargo in customs transit along the route Villabona, Spain - Verkhnyaya Salda, Russia, the plant of VSMPO-AVISMA Corporation. Moreover, FESCO delivered oversized cargo by road in customs transit along the route Świebodzin, Poland - Upper Salda, Russia, the plant of VSMPO-AVISMA Corporation. Specialized motor vehicles (modular semi-trailers, low-bed semi-trailers) were used for the transportation of cargo/
Cargo total weight 362 200 kg, 34 units up to 12 meters long, up to 4 meters high, up to 3.5 meters wide.
Relocation of four Container Straddle Carriers Kalmar CSC 340
Customer
LLC VOSTOCHNAYA STEVEDORING COMPANY
Period
Spring 2021
Job
FESCO Transportation Group performed relocation of four Container Straddle Carriers Kalmar CSC 340 between the terminals of the Global Ports group: from the First Container Terminal of the port of St. Petersburg to the Vostochnaya Stevedoring Company terminal of the Vostochny port in the Primorsky Krai.
The Straddle Carriers were preliminarily prepared for transportation: the upper railings were partially dismantled, and the lashing rings were welded.
Before being loaded onto the ship, the Straddle Carriers were installed onto 16 support stands, specially designed and manufactured for this transportation and required for placing and securing of Staddle Carriers on the deck of the vessel. The stands were mounted using a Liebherr LHM 400 mobile harbour crane. Each stand was 4 meters high and weighed almost 700 kg.
For transportation FESCO used its own multipurpose vessel “FESCO Paris”, equipped with cranes with a lifting capacity of 120 tons. Straddle Carriers were loaded onto the vessel by a ship crane.
Upon completion of loading and securing, the vessel headed to the port of Vostochny through the Suez Canal. The sea passage from the port of St. Petersburg to the port of Vostochny took 56 days.
In the port of Vostochny unloading of Straddle Carriers from the vessel was also carried out by a ship crane.
After unloading onto the berth, the Straddle Carriers moved under their own power to the rear technical area to be prepared for further operation.
Cargo - 4 Container Straddle Carriers Kalmar CSC 340 L 9.8 m x W 6.4 m x H 12.2 m, the weight of each unit 67 tons.
Transportation of Akkuyu NPP steam generators
Customer
Akkuyu Nuclear Power Plant
Period
2020
Job
Transportation of four steam generators weighing 365 tons each from the Atommash plant in Volgodonsk to the Vostochny marine terminal.
Loading of steam generators on the vessel in closed holds, delivery by sea to the first NPP in Turkey "Akkuyu".
Transshipment of steam generators from the vessel using a Crawler Crane Liebherr LR 1800 to a special storage area for OOG cargo on the territory of the NPP.
Steam generators are the main equipment of the first circuit of the reactor. The Akkuyu NPP project includes four power units with PWR-1200 generation (pressurized water type reactor) 3+ reactors, each unit is equipped with four steam generators.
Transportation of power equipment to Yerevan CHPP
Customer
Yerevan CHP
Period
2020
Job
Transportation and installation of power equipment for Yerevan CHPP. The cargo with a total weight of 14.5 thousand freight tons was delivered from Georgia to Armenia by rail and road.
OOG equipment: a gas turbine (205 tons), a transformer (182 tons) and a gas turbine generator (169 tons) were delievered from the Georgian port of Poti to Yerevan by rail on a sixth-axle transporter.
The rest of the cargo – a steam turbine generator (148 tons), a condenser (85 tons) and general cargo – were transported to the construction site by road. Special permits for transportation were obtained.
FESCO also organized the installation of five units of delivered power equipment with Lift System 44A portal systems with a carrying capacity of up to 400 tons and a Hydrospex Cylap HSL2000 with a carrying capacity of up to 800 tons.
Delivery of the reactor pressure vessel to Ruppur NPP, Bangladesh.
Customer
Ruppur NPP
Period
2020
Job
The FESCO Projects team delivered the next batch of equipment to Ruppur NPP, Bangladesh.
Sets of basic equipment arrived on motor vessel Daisy from Novorossiysk to port Mongla: a reactor pressure vessel, a steam generator, a polar crane.
Large-sized heavy equipment was reloaded to barges, which will then proceed to berth of Ruppur NPP.
There the equipment will be reloaded onto motor transport by a 600-ton crane for further delivery to the place of storage.
Total tonnage: 2363 tons, 8184 freight tons;
Reactor pressure vessel 347.2 tons;
Steam generator 333.755 tons;
Length of beams of the polar crane is 41.83 meters.
Delivery of equipment for the construction of the Rooppur NPP
Customer
Rooppur Nuclear Power Plant
Period
2020
Job
Transportation of equipment for the Rooppur NPP: reactor vessel, steam generator, polar crane from the port of Novorossiysk to the port of Mongla (Bangladesh). Total tonnage: 2363 tons, 8184 freight tons.
Transshipment of OOG equipment on barges that proceeded to the berth of the Rooppur NPP. There, the equipment was loaded onto vehicles with a 600-ton crane for further delivery to the storage site.
Amur Oil Refinery
Customer
Sinotrans Ltd. Energy Logistics Branch
Period
January 2019
Job
Delivery of pipes from port Busan to Russian Far Eastern ports Zarubino and Nakhodka by bulk vessels
Loading into gondola cars and delivery by rail to the place of operation of AGPP (Svobodny district, Amur region, Russia)
Unloading from gondola cars to trucks and delivery to the warehouse.
Construction of a Metafrax methanol production plant , Gubakha, Perm Territory
Customer
FAGIOLI S.p.A., Italy
Period
April – August 2019
Job
Development of a loading and fastening plan
Automobile transportation of a 25-meter reactor from Italy to a construction site in Gubakha, including customs formalities
Barge transportation of oversized equipment (separator/condenser) from the port of Constanta to Gubakha. Registration of transit formalities
Crane unloading > transportation to the construction site on modular semi-trailers
Transportation of nuclear reactor blocks, Petropavlovsk-Kamchatsky - Primorsky Territory
Customer
ROSATOM State Corporation, FSUE RosRAO, Russia
Period
August – September 2019
Job
Loading project development
Loading of equipment using tugs on a semi-submersible vessel in Petropavlovsk-Kamchatsky and subsequent transportation to the place of unloading in Primorsky Territory.
Transportation of Siemens equipment, St. Petersburg – Nizhnekamsk
Customer
ENKA / ENTRADE
Period
March – November 2019
Job
Transshipment of Siemens equipment in port Bronka, St. Petersburg
From the port some of the equipment was delivered to Nizhnekamsk by specialized motor transport and some by barges. Transshipment of equipment from an ocean vessel to a barge using ship cranes
Transshipment of equipment delivered by barge to the Transkama terminal, Nizhnekamsk using cranes for further transportation by specialized motor transport to the place of operation.
Transportation of main equipment for the construction of Nizhnekamsk CHP plant
Customer
ENKA İnşaat ve Sanayi A.Ş.
Period
May 2019
Job
Transshipment of cargo in port Bronka
Delivery by inland waterways to Transkama terminal
Organization of unloading from a barge-towing train to specialized motor vehicles
Delivery of equipment to construction site in Nizhnekamsk.
Transportation of excavator spare parts ESH24.95
Customer
Uralmashplant JSC
Period
2022
Job
Transportation of cargo from the production plant in Ekaterinburg to the port of PLP, Saint-Petersburg, loading onto a sea vessel and freight to the port of Kolkata, India;
Loading and unloading works at the port of departure PLP, Saint-Petersburg and at destination port Kolkata, India;
Import customs clearance in India.
CONSTRUCTION OF CCGT-44 TPP IN TEBINBULAK, UZBEKISTAN
Customer
Enter Engineering Pte. Ltd
Period
August – October 2022
Job
Transportation of 2 oversized and super-heavy units from Novolisino to the
port of KTSP in St. Petersburg;
Transhipment to a sea-river vessel for delivery to the port of Bautino,
Kazakhstan;
Transhipment in the port of Bautino onto trucks for delivery to the
construction site of the CHP in Tebinbulak, Uzbekistan.
CONSTRUCTION OF BAYSUN GPP, UZBEKISTAN
Customer
Enter Engineering Pte. Ltd
Period
June – October 2022
Job
Transportation of four oversized and super-heavy units from Shanghai to the
port of Haydarpaşa, Turkey;
Transshipment to a sea-river vessel for delivery to
the port of Bautino, Kazakhstan;
Transshipment in the port of Bautino onto
trucks for delivery to the construction site of the Baysun GPP.
IZ-KARTEX NAMED AFTER P.G.KOROBKOV LTD
Customer
IZ-KARTEX NAMED AFTER P.G.KOROBKOV LTD
Period
2022
Job
Transportation of cargo from the production plant in Kolpino to the port of
PLP, Saint-Petersburg, loading onto a sea vessel and freight to the port of
Kolkata, India;
Loading and unloading works at the port of departure PLP, Saint-Petersburg
and at destination port Kolkata, India;
Export customs clearance in Russia and import customs clearance in India;
Land transportation from the port to site (700-800 km).
Delivery of heavy equipment for the chemical plant under construction from Russia to Turkey
Customer
PJSC TATNEFT named after V.D. Shashin
Period
September 2022 - March 2023
Job
Road transportation by modular trailers from temporary storage warehouses in
Almetyevsk and Nizhnekamsk to the port of Nizhnekamsk (Republic of
Tatarstan);
Loading of equipment onto barges by the "RO-RO" method and crane
equipment;
Water transportation along the rivers Kama, Volga, Don, Azov and Black Seas
to the port of Tuzla of the Republic of Turkey;
Unloading of equipment by the Ro-Ro method and crane equipment in the port
of Tuzla, Republic of Turkey;
Construction of temporary bypass roads, some of which had a grade of more
than 13%;
Development by engineers of special retaining structures for lashing of reactors
on a modular trailer;
Road transportation on modular trailers to the construction site of the chemical
plant in the industrial zone "Gebkim";
Rigging of equipment and installation of reactor facilities in the design
position.
Delivery of equipment for the subsea production complex of the gas condensate field
Period
2020-2021.
Job
Transportation of equipment with a total weight of 2723 tons for the subsea production complex of the gas condensate field by charter vessel from the port of Hartlepool, Great Britain and the port of Murmansk, Russia to the port of Busan, the Republic of Korea through the Suez Canal.
The equipment was transported to Busan and placed for long-term storage under the control of FESCO for subsequent export to Sakhalin Island in several consignments on multi-purpose vessels and barges.
In addition, within the framework of this project, FESCO carried out lashing of protective structures on sea barges in the port of Sovetskaya Gavan (Khabarovsk Krai) and the Nabil terminal (Sakhalin Region).
Kudankulam NPP Construction Project, India
Customer
Atomstroyexport JSC
Period
May 2019
Job
Multimodal transportation of 4 sets of steam generators, collectors and related equipment from the AEM Technologies workshop in Volgodonsk to port Bolshoi in St. Petersburg.
Transportation of Liebherr gantry cranes, Saint Petersburg - Nakhodka
Customer
Global Ports LLC
Period
August – October 2019
Job
Loading and preservation of 4 Liebherr cranes in terminal Petrolesport, St. Petersburg. The weight of one unit is 116.96 tons.
Transportation and unloading in terminal of Vostochnaya Stevedoring Company LLC, port Vostochny, Nakhodka.
Ruppur NPP Construction Project, Bangladesh
Customer
Atomstroyexport JSC
Period
August 2018
Job
Multimodal transportation of equipment from port St. Petersburg to construction site of the Ruppur NPP in the Republic of Bangladesh.
Cargo transportation for HAVAL automobile plant
Customer
Haval Motor Manufacturing Rus
Period
September 2017 – August 2018
Job
Transportation of large-tonnage and oversized cargo from Shanghai, China to Tula region (Novomoskovsk) for the HAVAL automobile plant under construction (Great Wall)
Delivery of more than 1100 containers from Shanghai/Tianjin via Vladivostok and Mongolia to the Tula region
Delivery by the "Last Mile" and unloading of equipment at the construction site.
Transportation of steam superheaters, Podolsk - Armenian NPP (Metsamor, Armenia)
Customer
ZIO-Podolsk JSC
Period
April – July 2018
Job
Order of railway transporters, type 3925, 3928
Obtaining permits and approvals along the route from Russian Railways
Customs transit clearance
Ferry railway crossing from port Kavkaz to port Poti
Railway transportation to the Armenian NPP.
Transportation of equipment for construction of the Kola Shipyard, Belokamenka village, Murmansk region
Customer
CCCC, China Communications Construction Company (China)
Period
May – July 2018
Job
Transportation of cranes anf drilling rigs on route Shanghai, China — port Murmansk
Transshipment of cargo in port Murmansk to barge-tow trains and river freight to Belokamenka
Unloading in Belokamenka and motor transportation to construction site of the Kola shipyard. The maximum weight of a unit of cargo in a batch is 78 tons.
Transportation of transformers
Customer
Mosenergo (CHP 21 and CHP 25)
Period
February – March 2018
Job
Transshipment in port Novorossiysk
Transportation by heavy-duty rail transporters 3925 and 3928 to Moscow
Transshipment to trawls, delivery to site in Moscow
Customs clearance in port Novorossiysk.
Transportation of power equipment
Customer
Krasnoyarsk Construction Center
Period
January – February 2018
Job
Transportation on route Mertingen, Germany — Ust-Ilimsk, Russia
Transshipment in port Bronka, motor transportation to Ust-Ilimsk at extremely low temperatures (-38 C°)
Delivery of related general cargo from Germany by road - 21 trucks.
Taman Terminal.OTEKO
Customer
Zuest & Bachmeier Project GmbH
Period
2017–2018
Job
Freight forwarding services
Transshipment of a technological complex for unloading coal in port Novorossiysk, Burgas or Constanta on river-sea class vessels and cars
Cargo delivery in customs transit to the site of the construction terminal in Taman.
Freight forwarding services
Customer
CRCC (China Railway Construction Company)
Period
July – October 2017
Job
Transportation of five tunneling shields and their components (total volume 10600 m³, weight 3250 tons) for the Moscow Metro from port Shanghai, China to port Bronka, St. Petersburg, Russia. The weight of each shield assembled is 650 tons, parts of the shield weighing from 10 to 138 tons.
Customs clearance in port Bronka
The cargo was delivered from St. Petersburg to Moscow by river and motor transport.
Freight forwarding services
Customer
YAMAL LNG
Period
June – July 2017
Job
Transportation of factory equipment under the YAMAL LNG project from port Rostock and port Kaliningrad to port Sabetta.
The total weight of the cargo is 1 474 tons, the volume is 30 769 m³ (including the main platform weighing 600 tons, a vertical pipeline rack weighing 320 tons, the main staircase weighing 125 tons, a mezzanine weighing 63 tons).
Freight forwarding services
Customer
PJSC Power Machines
Period
August – September 2017
Job
Transportation of two hydraulic turbine impellers from St. Petersburg to the Krasnoyarsk HPP along the Northern Sea Route.
The length of the route is 6000 km.
Weight of each wheel is 245 tons, diameter is 8.65 m, height is 4 m. Auxiliary equipment weighing 160 tons.
Freight forwarding services
Customer
Afipsky Oil Refinery
Period
2017–2018
Job
Transportation of the hydrocracking complex of the Afipsky Oil Refinery. 10 cargo shipments.
Maximum weight of each unit is 743 tons, diameter is 5.5 meters, length is 54 meters. The total weight of all cargo is 19 000 tons. Transportation by sea from port Constanta to port Novorossiysk, delivery from port Novorossiysk to the construction site of Afipsky Oil Refinery.
Freight forwarding services
Customer
Gazprom Dobycha Shelf Yuzhno-Sakhalinsk LLC
Period
July – August 2017
Job
Transportation of equipment containing radioactive source IM07 for the needs of Kirinsky Gas Station by crane vessel from Aberdeen, Great Britain to Kholmsk, Sakhalin via the Northern Sea Route with icebreaker escort.
Freight forwarding services
Customer
PJSC Power Machines
Period
March – July 2017
Job
Transportation of equipment for construction of CHP plants (coal mills with a total weight of 444 tons and a volume of 1 426 m³) from Duisburg and Wetter, Germany and Izmir, Turkey to port Ho Chi Minh, Vietnam for the construction project of the Long Fu CHP plant.
Freight forwarding services
Customer
Fagioli S.p.A
Period
April – June 2017
Job
Transportation of special equipment (cast roll weighing 233 tons, dimensions 11 286 x 2 610 x 2 725 m) from Novorossiysk to Magnitogorsk by rail.
Freight forwarding services
Customer
Zvezda – Rosneft Oil Company
Period
August – September 2016
Job
Delivery of five cranes weighing from 100 to 320 tons each from China to the Bolshoy Kamen Bay by a specialized vessel, including ship agency and fastening services.
Freight forwarding services
Customer
Ministry of Defense of the Russian Federation
Period
July – August 2016
Job
Transportation of 9 000 freight tons of equipment and construction materials from Arkhangelsk to facilities under construction on the island of Wrangel and M. Otto Schmidt (Chukchi Sea)
Processing of ship's lot in port Arkhangelsk and unloading on the roadstead with delivery to the shoreline of places of unloading places.
FESCO uses cookies developed by our specialists and third parties to analyze the website traffic and to improve our services and interaction with users. By continuing to browse the site, you are agreeing to our use of cookies. You will find more detailed information in our Privacy Policy